document  01-PCS105_Sellafield OBC Document_190917_BP_Extract_B.pdf713
document  16.08.19 NEC_ECC_Call-Off_Contract_-_Calder_Hall.pdf879
document  20170809-FC17_035_06_01 - F4 Characterisation Report Issue 2.pdf211
document  20170811-FC13_132_06_02 - Characterisation Report Issue 3.pdf787
document  20170811-FC13_183_06_02 - Characterisation Report.pdf795
document  20170811-FC17_035_06_01 - F4 Characterisation Report.pdf208
document  20170811-FC17_041_06_01 - F9 Characterisation Report.pdf256
document  20170811-FC17_042_06_01 - Characterisation Report (2).pdf182
document  20170811-FC17_043_06_01 - F19 and F77 Characterisation Report.pdf212
document  20170908-FC17_041_06_01 - F9 Characterisation Report Issue 2.pdf259
document  20170908-FC17_042_06_01 - Characterisation Report Issue 2.pdf187
document  20170908-FC17_043_06_01 - F19 and F77 Characterisation Report Issue 2.pdf210
document  20171221-FC13_183_06_02 - Characterisation Report Issue 2.pdf783
document  AE35956_B Cross Section Through Power Station on A-A.pdf220
document  AE35982_L Turbine House Trenches Between Stanchions A1 to K1 and A8 to K7.pdf448
document  AE35983_L Turbine House Trenches Between Stanchions A8 to K7 and A16 to K15.pdf420
document  AE35984_M Turbine House Trenches Between Stanchions A16 to K15 and A23 to K23.pdf424
document  AE35990_A Turbine Room Floor Level.pdf334
document  AE37672_K Arrangement of cable subways and routes around turbine house.pdf227
document  AE37821_X Arrangement schematic of 415v phase 1 power distribution turbine house.pdf197
document  AE37868_A General Arrangement of Cooling Water System.pdf169
document  AE38850_E Turbine Room Basement Level.pdf500
document  AE38865_F Turbine House Basement Between Stanchions K17 and A17 To E23 And A23.pdf224
document  AE39166_K Foundations (Elevations) Turbo Alternator.pdf897
document  AE39167_K Foundations (End Views) Turbo Alternator.pdf685
document  AE40207_A Supports For Instruments Switchgear and Starters in Turbine House.pdf315
document  AE40411_V Electric Cable Routes Turbine House Basement Calder Arrangement.pdf442
document  AE40512_A Details of HP and LP combined cylinder exhaust.pdf457
document  AE40856_C Foundations for Reactor Transformer Bays Turbine House.pdf204
document  AE40937_B Turbine House Annex Floor South End Arrangements.pdf217
document  AE41262.txt1
document  AE41682_Q Cable Routes In Control Room Cable Mezzanine Turbine House .pdf405
document  AE41696_M Cable Routes Cable Basement Control Block Turbine House Building.pdf360
document  AE43506_A Turbine Hall Elevations on Annex Looking East.pdf234
document  AE43996_A Extension Tails For Phase And Earth Leads Turbine House.pdf301
document  AE73728_A Dump Condenser Assembly Turbine House.pdf227
document  B103763_L Water Supply Records Sheet E99.pdf4162
document  B130527_L Redline.pdf812
document  B9051_A Oil Interceptors General Arrangement (F3).pdf525
document  B9521_A Oil Interceptors (F3).pdf98
document  B9730_A Oil Interceptors Detail South End Turbine House.pdf54
document  B9731_A Oil Interceptors Details.pdf49
document  BE2583377 redlined.pdf335
document  BE2797100_B Redline Mark-up 02 July 2018.pdf82
document  BE2797100_B Redline Mark-up 02 July 2018.pdf82
document  BE2797100_B Turbine Hall A PD206 Single Line Diagram.pdf60
document  BE2797100_B Turbine Hall A PD206 Single Line Diagram.pdf60
document  Calder Land Clearance Project Mandatory Work Breakdown Structure.pdf172
document  CD_162 F77 Workshop Management Survey.pdf171
document  CFMT 121.1 Guidance for CFMT 121.pdf313
document  CFMT 121.doc113
document  CFMT 121.doc113
document  CFMT 122.1 Supp CoC applicable to Work subject to IRR 2017.doc79
document  CFMT 122.2 Supp Coc applicable to Work subject to IRR 2017 Areas by Contractor.doc63
document  CFMT 328 Request For Clarification.doc56
document  CFMT 328 Request For Clarification.doc56
document  CFMT 356 Modern Slavery Act 2015 Supplier Code of Conduct.pdf7241
document  CHMSC(15)P010 Calder Hall Environment Case.pdf4912
document  CLC Guidance Note on Secondary Outcomes.pdf1109
document  CLC Guidance Note on Secondary Outcomes.pdf1109
document  CLC Outcome Hierarchy Document.pdf545
document  cs&a gpn 001 - concrete design.pdf32
document  cs&a gpn 002 - roof edge protection.pdf29
document  cs&a gpn 003 - iso 10721-2.pdf28
document  cs&a gpn 004 - eurocodes.pdf29
document  cs&a gpn 005 - blind bolts.pdf65
document  cs&a gpn 006 - masonry.pdf30
document  cs&a gpn 007 - lap lengths to aci 318.pdf29
document  cs&a gpn 008 - software.pdf30
document  cs&a gpn 009 - anchors.pdf29
document  cs&a gpn 010 - standards.pdf30
document  cs&a gpn 011 - building appearance.pdf34
document  cs&a gpn 012 - specifying concrete.pdf32
document  cs&a gpn 013 - traffic loading.pdf30
document  cs&a gpn 014 - specifying reinforcement.pdf46
document  cs&a gpn 015 - steel construction institute.pdf34
document  cs&a gpn 016 - cs&a standards and guides.pdf42
document  cs&a gpn 017 - tank.pond & basement crack-width design.pdf37
document  cs&a gpn 018 - secondary liquid containment.pdf35
document  cs&a gpn 019 rev b - temporary works (scaffolding & falsework) arrangements.pdf61
document  cs&a gpn 020 - use of duplex stainless steel.pdf29
document  cs&a gpn 021 - cs&a good practice notes.pdf32
document  cs&a gpn 022 - building cladding - insulation & fire risk.pdf136
document  cs&a gpn 023 - staggered laps and couplers.pdf34
document  cs&a gpn 024 - reinforcement scheduling deductions and cover conflict.pdf35
document  cs&a gpn 025 - cs&a project contacts list.pdf33
document  cs&a gpn 026 - use of foamed concrete or grout at sellafield.pdf35
document  cs&a gpn 027 - ballasted edge protection.pdf130
document  cs&a gpn 028 - computer software - verification and validation.pdf34
document  cs&a gpn 029 - recurrence interval for extreme wind load.pdf66
document  cs&a gpn 030 - use of hsfg tension control bolts - update.pdf121
document  cs&a gpn 031 - projects generating spoil from sellafield licensed site for disposal.pdf115
document  cs&a gpn 032 - seismic standards.pdf127
document  cs&a gpn 033 rev a - specifying galvanizing for external structural steelwork at sellafield.pdf40
document  cs&a gpn 034 - non-fixed load lifting attachments - lifting beams, lugs and brackets.pdf133
document  cs&a gpn 035 - design, drawings and specification - clarity and consistency.pdf23
document  cs&a gpn 036 rev a - construction products regulation (cpr) and ce marking of steelwork.pdf138
document  cs&a gpn 037 - loading from eot cranes on supporting steelwork - design and assessment.pdf106
document  cs&a gpn 038 - cs&a design intelligent customer and leadership (dicl) role.pdf149
document  cs&a gpn 039 - application of structural eurocodes to sellafield designs.pdf65
document  DDP CEMAR Access Request.xlsx56
document  DDP00311 - CLC - Invitation to Tender.pdf698
document  DDP00311 - CLC THA - Site Information (Rev A).pdf352
document  DDP00311 - CLC THA - Works Information (Rev02).pdf894
document  DDP00311 - CLC THA - Works Information Allocation Levels (Rev01).pdf333
document  DDP00311 - CLC01 (Issue 01).pdf276
document  DDP00311 - CLC02 (Issue 01).pdf276
document  DDP00311 - CLC03 (Issue 01).pdf271
document  DDP00311 - CLC04 (Issue 01).pdf273
document  DDP00311 - CLC05 (Issue 01).pdf275
document  DDP00311 - CLC06 (Issue 01).pdf274
document  DDP00311 - Contract Data Part 1 (Rev01).pdf518
document  DDP00311 - Contract Data Part 2 (Rev01).docx42
document  DDP00311 - Opportuity Fee.pdf402
document  DDP00311 - Outcome Payment Process.pdf697
document  DDP00311 - Task Form - Part 1.pdf234
document  DDP00311 - Template Outcome Profile.doc63
document  Tender Evaluation Criteria (Rev01) with track changes1284
document  Tender Evaluation Criteria (Rev01)1210
document  DDP00311 - Tender Evaluation Criteria Rev2 track changes.pdf1210
document  DDP00311 - Tender Evaluation Criteria Rev2.pdf1209
document  DDP00311 - Tender Evaluation Criteria Rev3 track changes.pdf1292
document  DDP00311 - Tender Evaluation Criteria Rev3.pdf1204
document  DDP00311 - Tender Evaluation Criteria.pdf1120
document  DDP00311 - Tender Pricing Template.xlsx181
document  DDP00311 - Tender Pricing Template.xlsx181
document  DJL_46145 Survey Report Steam Lines.pdf726
document  Example SQEP Matrix.xlsx22
document  F19 outside areas July 17.pdf127
document  F19 Survey Both Floors.pdf173
document  F19 Survey July 17.pdf184
document  F21.2 & F9 Survey.pdf160
document  F4 Both Floors.pdf222
document  FC13_183_02_02 - F3 QS Report.pdf1056
document  FC17_035_02_04 - F4 QS Report.pdf737
document  FC17_041_02_08 - Quantity Surveyors Report.pdf833
document  FC17_042_02_02 - Quantity Surveyors Report.pdf472
document  FC17_043_02_02 - Quantity Surveyors Report.pdf757
document  FC17_043_02_06 - F77 QS Report.pdf521
document  HSP_CALDER_PROJ_00030_B Calder Land Clearance PCIR - SIGNED.pdf2579
document  KCD_292 F9 Management Survey 2015.pdf1399
document  KCD_306 F3 Turbine Hall A Management Survey.pdf5553
document  KCD_F19_External_Pipework.pdf957
document  KFR_18S_027 Calder Route 17.pdf411
document  KFR_19_929 Calder Steam Lines.pdf11280
document  KFR_29 Calder Excavation Compound Area between R2 and R3.pdf394
document  KFR_567 F19 Inspection Survey 2017.pdf1162
document  KFR_576 F4 Management Survey Inspection 2018.pdf1221
document  NFR_CALDER_PROJ_00414_A Summary of cable disconnections.xlsx229
document  No Appendix C for F77.txt0
document  Note on Official Sensitive Information.pdf67
document  OBC Cornerstones and Principles.pdf673
document  PID Impact Assessment Criteria.pdf97
document  Risk Register Template.xlsx21
document  RP_CALDER_CSA_000127 Crane Rail Alignment Survey.pdf4270
document  RP_CALDER_PROJ_00383_(F9).pdf10828
document  RP_CALDER_PROJ_00391 - F3 Appendix A (Mech Services).xlsx22
document  RP_CALDER_PROJ_00391 - F3 Appendix B (Elec Services).xlsx56
document  RP_CALDER_PROJ_00391 - F3 Appendix C (Civ D&T).xlsx9250
document  RP_CALDER_PROJ_00391 - F3 Appendix C (Civ DRAINAGE).xlsx38
document  RP_CALDER_PROJ_00391 - F3 Appendix C (Civ PIPEBRIDGES).xlsx21
document  RP_CALDER_PROJ_00391_(F3).pdf11733
document  RP_CALDER_PROJ_00392 - F4 Appendix A (Mech Services).xlsx15
document  RP_CALDER_PROJ_00392 - F4 Appendix B (Elec Services).xlsx21
document  RP_CALDER_PROJ_00392 - F4 Appendix C (Civ D&T).xlsx9250
document  RP_CALDER_PROJ_00392 - F4 Appendix C (Civ DRAINAGE).xlsx38
document  RP_CALDER_PROJ_00392_(F4).pdf9535
document  RP_CALDER_PROJ_00393 - F9 Appendix A (Mech Services).xlsx17
document  RP_CALDER_PROJ_00393 - F9 Appendix B (Elec Services).xlsx15
document  RP_CALDER_PROJ_00393 - F9 Appendix C (Civ D&T).xlsx9250
document  RP_CALDER_PROJ_00393 - F9 Appendix C (Civ DRAINAGE).xlsx38
document  RP_CALDER_PROJ_00394 - F19 Appendix A (Mech Services).xlsx15
document  RP_CALDER_PROJ_00394 - F19 Appendix B (Elec Services).xlsx20
document  RP_CALDER_PROJ_00394 - F19 Appendix C (Civ D&T).xlsx9250
document  RP_CALDER_PROJ_00394 - F19 Appendix C (Civ DRAINAGE).xlsx37
document  RP_CALDER_PROJ_00394 - F19 Appendix C (Civ PIPEBRIDGES).xlsx21
document  RP_CALDER_PROJ_00394_(F19)_REV_A.pdf12743
document  RP_CALDER_PROJ_00395_(F77).pdf3367
document  RP_CALDER_PROJ_00396 - 'The Cube' Appendix A (Mech Services).xlsx23
document  RP_CALDER_PROJ_00396 - 'The Cube' Appendix B (Elec Services).xlsx80
document  RP_CALDER_PROJ_00396 - 'The Cube' Appendix C (Civ D&T).xlsx9250
document  RP_CALDER_PROJ_00396 - 'The Cube' Appendix C (Civ DRAINAGE).xlsx38
document  RP_CALDER_PROJ_00396 - 'The Cube' Appendix C (Civ PIPEBRIDGES).xlsx21
document  RP_CALDER_PROJ_00396 - F77 Appendix A (Mech Services).xlsx15
document  RP_CALDER_PROJ_00396 - F77 Appendix B (Elec Services).xlsx14
document  RP_CALDER_PROJ_00396_A (Cube).pdf18368
document  RP_CALDER_PROJ_00403_A - CLC services investigation update.pdf518
document  RP_CALDER_PROJ_00405_B CLC IC Strategy.pdf1297
document  RP_CALDER_PROJ_00405_B CLC IC Strategy.pdf1297
document  RP_CALDER_PROJ_00406_A CLC Stakeholder Plan.pdf992
document  RP_CALDER_PROJ_00406_A CLC Stakeholder Plan.pdf992
document  SK_ELEC_001_A.pdf905
document  SK_ELEC_002_A.pdf658
document  SK_ELEC_003_A.pdf794
document  SK_ELEC_004_A.pdf1229
document  SK_ELEC_005_A.pdf158
document  SK_ELEC_006_A.pdf163
document  SK_ELEC_007_A.pdf161
document  SK_ELEC_008_A.pdf370
document  SK_ELEC_009_A.pdf194
document  SK_ELEC_010_A.pdf202
document  SK_ELEC_011_A.pdf239
document  SK_ELEC_012_A.pdf144
document  SK_ELEC_013_A.pdf123
document  SK_ELEC_014_A.pdf87
document  SK_ELEC_015_A.pdf86
document  SK_ELEC_016_A.pdf106
document  SK_ELEC_017_A.pdf150
document  SK_ELEC_018_A.pdf255
document  SK_ELEC_019_A.pdf100
document  SLCP 2.11.01.pdf56
document  SLCP 4.01.02.pdf67
document  SLCP 4.04.02.pdf65
document  SLF 1.10.407.03.doc84
document  SLF 3.02.21 - IR Questionnaire 2013.doc87
document  SLF 3.08.01.01.xls184
document  SLM 2.17.02.pdf1700
document  SLM 3.05.01.pdf2604
document  SLM 4.06.02 Iss 3.pdf1397
document  SLP 1.10.771.pdf293
document  SLSP 1.10.315.01.pdf476
document  Stakeholder identification tool 27.11.18.xlsx32
document  TBH A survey July 17.pdf249
document  TEMPLATE SECONDARY OUTCOME DDP00311 - CLC01.01 (Issue 01).doc66
document  There are no pipebridges associated with F9.txt0