SSA
Instructions:
Here are all documents for specified package. Some documents are available to download without the need to logon.
Documents - Package 16542:1 - Dragon B78 Rail Extension
Document available to download
Size (kB)
0W20200017 Issue A Crane Rail Extension B78.pdf
277
0W20200017 Issue A Crane Rail Extension B78.pdf
277
Assessment Guidance and Tender Response Information for B78 Rail Extension (3).docx
192
Assessment Guidance and Tender Response Information for B78 Rail Extension (3).docx
192
Cover Letter for Dragon B78 Rail Extension.pdf
179
DSC00276.JPG
6880
DSC00276.JPG
6880
DSC00277.JPG
7134
DSC00277.JPG
7134
DSC00278.JPG
7203
DSC00278.JPG
7203
DSC00279.JPG
7572
DSC00279.JPG
7572
DSC00280.JPG
7267
DSC00280.JPG
7267
DSC00281.JPG
7170
DSC00281.JPG
7170
ECSC Contract B78 Rail Extension.pdf
386
ECSC Contract B78 Rail Extension.pdf
386
Appendix 1 - EHSQ Policy
4879
EHSQ Policy.pdf
4879
Appendix A - Procedure note to SLC's and Subsidiaries on Construction Insurance (INPR01)
347
Appendix A - Procedure note to SLC's and Subsidiaries on construction Insurance (INPR01)
347
Appendix B - 'Z' Clauses
336
Appendix B- 'Z' Clauses
336
Q&A Rail Extension.docx
18
Q&A Rail Extension.docx
18
RET 2225 Issue 1 Dragon B78 Rail Extension Specification.pdf
330
RET 2225 Issue 1 Dragon B78 Rail Extension Specification.pdf
330
Appendix 2 - S481 Contractor General Requirements
2345
S-481 Contractor General Requirements Issue 9.pdf
2345
Appendix 2 - S482 Construction and Demolition Work
1122
S-482 Construction and Demolition Work Requirements Issue 5.pdf
1122
Appendix 2 - S483 Contractor Non-Radioactive Waste Requirement
217
S-483 Contractor Non-Radioactive Waste Requirement Issue 5.pdf
217
Appendix 2 - S484 Contractor Ionising Radioactive Work Requirement Issue
224
S-484 Contractor Ionising Radiation Work Requirement Issue 5.pdf
224
Site Information - 18_1022_SHT 1 (Mech_Services).pdf
200
Site Information - 18_1022_SHT 1 (Mech_Services).pdf
200
Site Information - 18_1022_SHT 2 (Elec_HV).pdf
103
Site Information - 18_1022_SHT 2 (Elec_HV).pdf
103
Site Information - 18_1022_SHT 3 (Elec_LV).pdf
145
Site Information - 18_1022_SHT 3 (Elec_LV).pdf
145
Site information - 18_1022_SHT 4 (Comms).pdf
92
Site information - 18_1022_SHT 4 (Comms).pdf
92
Site Information 0W20040336_ 0' 0C.jpg
101
Site Information 0W20040336_ 0' 0C.jpg
101
Site Information 0W20150004_A - Dragon Scheme Design Plans and Elevations.pdf
5670
Site Information 0W20150004_A - Dragon Scheme Design Plans and Elevations.pdf
5670
Site Information AD_SZ_5030_11_B.jpg
48
Site Information AD_SZ_5030_11_B.jpg
48
Site Information AD_SZ_5030_12_B.jpg
51
Site Information AD_SZ_5030_12_B.jpg
51
Site information AD_SZ_5030_15_d.jpg
146
Site information AD_SZ_5030_15_d.jpg
146
Site Information AD_SZ_5030_17_C.jpg
64
Site Information AD_SZ_5030_17_C.jpg
64
Site Information AD_Z_5030_1.jpg
59
Site Information AD_Z_5030_1.jpg
59
Works Information.pdf
1083
Works Information.pdf
1083
Print...
Close window