DDP/PFCS/00175 - Asset Modification for Retrievals Argon Supply

The rft has ended, you cannot answer the invitation.

The PFCS retrievals project requires an Argon supply to provide inerting to the interior of the Early Retrievals Main Containment Room (MCR). The scope includes the supply, fabrication, inspection, testing and installation of the Argon B tie-in for retrievals spools and equipment as per Task Specification SP/B14-1062/MECH/00172/A including valves, flowmeter, seismic isolator and Pressure Relief Valve (PRV). Move a pre-existing electrical junction box to enable installation of the pipe spools. Supply and install the specified Kurz Flowmeter and relevant CE&I connections. To supply, fabricate, inspect, test and install the Argon A rerouted pipework and supports systems as per Task Specification SP/B14-1062/MECH/00171/A.

Works

30/03/2018 12:00:00

45351000-2  Mechanical engineering installation works

Published notices
Awarded Contract (Contracts Finder) 12/07/2018 15:30
Packages
Asset modification for retrievals Argon supply
Additional information:
Documents Documents
Close