Phase 1 Habitat Survey - Phase 1 Habitat Survey

The rft has ended, you cannot answer the invitation.

The scope of the specification is to define ecological survey work scope in support of the Statutory Planning application. This will involve an opening up meeting with the Project Environmental Manager and SO representative to confirm areas to be included in site walkdown, to carry out a supervised site walkdown of the Project site at Sellafield and produce a Phase 1 Habitat Survey Report that identifies recommendations for further ecological survey work and/or mitigation required to enable the development of the area

Services

27/08/2021 12:00:00

71510000-6  Site-investigation services
71355000-1  Surveying services
71241000-9  Feasibility study, advisory service, analysis
71250000-5  Architectural, engineering and surveying services
71313000-5  Environmental engineering consultancy services
71313400-9  Environmental impact assessment for construction

Sellafield (Cheshire)
CTM Portal for the NDA Shared Services Alliance
Calder Bridge
CA20 1PG
Seascale
United Kingdom

Lynda Hadfield
https://www.gov.uk/government/case-studies/shared-services-alliance-ssa-for-nuclear-decommissioning-estate