Refurbishment of emergency standby electricity generator GT1

Upgrade of the GT1 controls which are obsolete. Design, manufacture, test and installation of new complete UCP (unit control panel) to replace the existing TCP/GCP (No “generator protection” is included) sections for the Centrax CX501 KB5 Generator. Design, manufacture, test and installation of new fire system, including new bedplate CO2 nozzles/sounders/sensors and repeater panels. Installation to replace the existing fire system for the Centrax CX501 KB5 Generator set .

Supplies

21/06/2021 10:00:00

30237280-5  Power supply accessories

Sellafield (Cheshire)
CTM Portal for the NDA Shared Services Alliance
Calder Bridge
CA20 1PG
Seascale
United Kingdom

Craig Greenough (Locked)
https://www.gov.uk/government/case-studies/shared-services-alliance-ssa-for-nuclear-decommissioning-estate

Published notices
Awarded Contract (Contracts Finder) 30/09/2021 17:57
Packages
Refurbishment of emergency standby electricity generator GT1