B418 /RFQ/SJD - B418 Post Operation Clean Out and Characterisation works

The rft has ended, you cannot answer the invitation.

Key activities of the Contractor under the B418 Characterisation and POCO scope of the works include: • The management and execution of the works • The provision of the sampling and analysis plan • The health physics survey of the facility. • The recovery of suitable samples to allow waste characterisation. • The recovery samples to allow building characterisation • The size reduction, segregation and packaging of all waste material • The undertaking of HRGS to all packages, pallets or items moved into B418.19 • The undertaking of HRGS to all samples before dispatch. • The radiological activity and transport calculations required to comply with ADR for the movement of all materials – both on the Premises and for dispatch to laboratory. • The movement too and storage of all packaged items to B418.19 • The transport of all samples to a suitable laboratory for analysis. • The recording, tracking and documentation of the works

Works

04/04/2022 12:00:00

98391000-0  Decommissioning services
79723000-8  Waste analysis services

Magnox
CTM Portal for the NDA Shared Services Alliance
Calder Bridge
CA20 1PG
Seascale
United Kingdom

Sally-Jane Dive
https://www.gov.uk/government/case-studies/shared-services-alliance-ssa-for-nuclear-decommissioning-estate

Published notices
Awarded Contract (Contracts Finder) 23/06/2022 14:11
Packages
B418 Post Operation Clean Out and Characterisation works