1.1 SEP1 RVSS Manufacture 1.2 Advanced Drilling SEP1 Brackets 21/22 + Rail Shoes 1.3 SEP1 Manufacture Counter Balance Lifting Beam for B21 & B22 1.4 Anchor Bolts for Brackets 21 & 22 1.5 SEP1 Manufacture Brackets 21 & 22 1.6 SEP1 Bracket 23 Modifications including Anchor Bolts 1.7 Rails 1E & 2H Modifications 1.8 SEP1 Brackets 21 and 22 Installation 1.9 SEP1 Bracket 23 Installation 1.10 SEP1 Rails & Vertical Support Shoe (RVSS) Installation
09/06/2017 12:00:00
98391000-0 Decommissioning services
45255400-3 Fabrication work
45223110-0 Installation of metal structures
Sellafield (Cumbria)
Leah Maudling
https://www.gov.uk/government/case-studies/shared-services-alliance-ssa-for-nuclear-decommissioning-estate
| Notice | Date of dispatch |
|---|---|
| Awarded Contract (Contracts Finder) | 02/11/2017 12:00 |