Date of dispatch of this notice: 19/07/2018
External Reference: 7f0c2727-bdd7-4fbb-85e8-5480e0f50ec9
Date of dispatch of this notice: 19/07/2018
External Reference: 7f0c2727-bdd7-4fbb-85e8-5480e0f50ec9
Official name: Dounreay Site Restoration Limited
Url:
Address line 1: Dounreay, Building D2003
Town: Thurso, Caithness
Postal Code: KW14 7TZ
Country: Scotland
Contact person: Emma Gordon
E-mail: emma.gordon@dounreay.com
Phone: +44 1847802479
Title attributed to the contract: Design, Fabrication, Installation, Testing & Commissioning of the Treatment Systems for DFR Package 1
Description:
The scope of the works is for design, build, testing, installation and commissioning of equipment for the removal of the remaining DFR NaK residues in the DFR Reactor, Dump Tanks and D1115 components. The scope of works comprises of the completion of the following activities: • Review of current (DSRL) Concept Designs • Production of a Consolidated Concept Design • Production of Scheme and Detail Designs • Production of the following Safety Cases: o Preliminary Safety Report (PSR) o Pre Construction Safety Report (PCSR) o Pre Commissioning Safety Report (PCmSR) o Pre Operational Safety Report (POSR) • Production of the following Environmental Documentation: o Best Practical Environmental Options (BPEO) o Best Practical Means (BPM) • Procurement of Materials, Systems and Components • Manufacture and Fabrication • Factory Acceptance Testing (FAT) • Packing, Transportation and Delivery to the Dounreay Site • Enabling Works including Provision of Services • Installation of Manufactured Items • Undertake and Complete Inactive Commissioning with Handover to DSRL • Provision of a Handover Package The Employer will be responsible for the active commissioning, operation and decommissioning activities that will take place in 2021 to 2022.
Additional data
User / Company
Awarded Date: 21/06/2018
Awarded Value:
5,958,895.00
Contract start date: 02/07/2018
Contract end date: 24/12/2021