45000000
-
Construction work
45200000
-
Works for complete or part construction and civil engineering work
45213250
-
Construction work for industrial buildings
45222100
-
Waste-treatment plant construction work
45222110
-
Waste disposal site construction work
66140000
-
Portfolio management services
71240000
-
Architectural, engineering and planning services
71242000
-
Project and design preparation, estimation of costs
71243000
-
Draft plans (systems and integration)
71244000
-
Calculation of costs, monitoring of costs
71245000
-
Approval plans, working drawings and specifications
71300000
-
Engineering services
71310000
-
Consultative engineering and construction services
71311000
-
Civil engineering consultancy services
71311100
-
Civil engineering support services
71320000
-
Engineering design services
71321000
-
Engineering design services for mechanical and electrical installations for buildings
71322000
-
Engineering design services for the construction of civil engineering works
71322100
-
Quantity surveying services for civil engineering works
71323000
-
Engineering-design services for industrial process and production
71324000
-
Quantity surveying services
71330000
-
Miscellaneous engineering services
71340000
-
Integrated engineering services
71350000
-
Engineering-related scientific and technical services
71540000
-
Construction management services
71541000
-
Construction project management services
72224000
-
Project management consultancy services
79410000
-
Business and management consultancy services
79421000
-
Project-management services other than for construction work
79994000
-
Contract administration services
NUTS code:
UK -
UNITED KINGDOM
Main site or place of performance:
Warrington
SL has engaged a Civils Construction Partner with considerable construction management expertise in a regulated industry to contribute to Major Projects solutions and to manage and deliver the construction of Major Projects. In the early years these will be predominantly Major Projects with a civil and structural works bias but this focus may change over time. It is anticipated that the Lot 3 Civils Construction Partner will be the lead Construction Partner for the SRP project, whilst the Lot 4 Process Construction Partner will be the lead Construction Partner for the SCP Project. For the construction element of the other Major Projects, SL anticipates that approximately 50% will be led by the Lot 3 Partner. This proportion and the methodologies for the allocation of the construction elements of Major Projects was further developed in the ITN and post award as part of the comprehensive procurement plan for the PPP Partnership.
The Lot 3 & Lot 4 Partners will work collaboratively together (and with the other Partners) to develop an integrated supply chain as part of the procurement plan for the PPP Partnership to deliver the portfolio of Major Projects.
The scope of Lot 3 comprises Major Projects and Site-Wide Project Delivery Improvements. These two elements are explained in more detail below.
Major Projects
Services in support of the delivery of these Major Projects individually and at a programme level will include but not be limited to:
— Managing the procurement and delivery of all services, materials and equipment required to deliver the construction programme including the provision, integration, quality management and oversight of supply chain arrangements, which shall also incorporate the use of existing SL supply chain arrangements (such as category management contracts) for the construction supply chain;
— Managing the construction of Major Projects including:
— construction phase planning and associated logistics;
— on site construction, installation and commissioning including the management, inspection and quality assurance of these activities;
— Supporting SL in its capacity as Intelligent Customer in the active commissioning of Major Projects;
— Supporting the Lot 1 Partner in defining the delivery strategy for the Major Projects, including an overall acquisition strategy, cost estimates and delivery schedule development for the potential full portfolio of Major Projects, and resource and capability planning;
— Support to the Lot 1 and 2 Partners throughout the project lifecycle in regard to constructability reviews, value engineering and value management, to ensure the integration of construction consideration and expertise into all phases of a Major Project;
— Supporting the PPP Partnership in developing and improving its construction arrangements through provision of expertise in construction methodology and benchmarking, including design to support construction's phased delivery and appropriate modularisation; and
— Supporting the Lot 1 and Lot 2 Partners in engaging with SL's EPO and programmes to develop the portfolio of future Major Projects, deliver studies and develop the forward schedule of Major Projects.
As with the other Lot Partners, the Civils Construction Partner will be required to work with the other PPP Partners (i.e. the Lot Partners and SL) to develop an aligned delivery culture for the PPP Partnership. SL will also make available people from within its organisation to work within the PPP Partnership (as the "5th Partner") to support the Lot Partners in the delivery of their respective services and works (see MOI).
Site-Wide Project Delivery Improvements
Site-Wide Project Delivery Improvements will include but not be limited to (alongside the Lot 4 Partner): leading business improvements such as lean construction techniques, access services, logistics etc; and the provision of construction management professionals to support SL on non-Major Projects.
Criteria below
Quality criterion
-
Name:
Quality
/
Weighting:
70%
Cost criterion
-
Name:
Cost
/
Weighting:
30%
The procurement is related to a project and/or programme financed by European Union funds:
no
See VI.3 ‘Additional Information’ re overall PPP Project value. Lot 3 Estimated Value is between: 1 000 000 000 GBP—1 500 000 000 GBP over the next 20 years which represent the proportional scope of services of the Lot 3 Partner in the delivery of the PPP Project.