II.1)
Scope of the procurement
Carbon-14 Release of Irradiated AGR Graphite
Reference number:
RWM181
73000000
-
Research and development services and related consultancy services
Services
II.1.4)
Short description
RWM wishes to commission a study to measure and further understand the release of carbon-14 from irradiated graphite under a range of relevant conditions. This will involve measurement of total carbon-14 release into the gas and aqueous phases during leaching in an appropriate solution, together with characterisation of the composition. Specifically, this study would investigate the release of carbon-14 from Advanced Gas-cooled Reactor (AGR) graphite and compare to the previous results obtained from WAGR, BEP0 and Magnox graphite. This will require an experimental programme that closely follows the methods and test durations previously studied for Magnox graphite to provide comparable results.
II.1.5)
Estimated total value
Value excluding VAT: 950000.00
GBP
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
73100000
-
Research and experimental development services
73110000
-
Research services
73111000
-
Research laboratory services
73200000
-
Research and development consultancy services
73300000
-
Design and execution of research and development
II.2.3)
Place of performance
NUTS code:
UK -
UNITED KINGDOM
Main site or place of performance:
Didcot
II.2.4)
Description of the procurement
: RWM wishes to commission a study to measure and further understand the release of carbon-14 from irradiated graphite under a range of relevant conditions. This will involve measurement of total carbon-14 release into the gas and aqueous phases during leaching in an appropriate solution, together with characterisation of the composition. Specifically, this study would investigate the release of carbon-14 from Advanced Gas-cooled Reactor (AGR) graphite and compare to the previous results obtained from WAGR, BEP0 and Magnox graphite. This will require an experimental programme that closely follows the methods and test durations previously studied for Magnox graphite to provide comparable results. RWM request that the contractor propose a baseline schedule based on a total leaching duration of 24 months, with appropriate scheduled sampling intervals. RWM also request that schedules based on 36 and 48 month leaching durations are also included as optional tasks/extensions, that would allow the leaching to be extended if the results towards the end of 24 months warrant further experimental studies.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 950000.00
GBP
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
36
This contract is subject to renewal:
yes
Description of renewals:
Subject to results of experimental programme the contract may be extended by 12 and/or 24 months.
II.2.10)
Information about variants
Variants will be accepted:
yes
II.2.11)
Information about options
Options:
yes
Description of options:
Subject to results of experimental programme the contract may be extended by 12 and/or 24 months.
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no