Official name: Radioactive Waste Management
Url: https://www.gov.uk/government/case-studies/shared-services-alliance-ssa-for-nuclear-decommissioning-estate
Address line 1: Building 329, Thomson Avenue
Town: Didcot
Postal Code: OX110RH
Country: England
Contact person: Anthony E Potts
E-mail: tony.potts@nda.gov.uk
Phone: +44 1925802897
Title attributed to the contract: Site Descriptive Model Development: Supply Chain Support for Capability Building Early Site Characterisation
Description:
This scope of work covers the site characterisation activities that would need to be undertaken by RWM from initial understanding based upon desk-based studies through initial seismic reflection surveys to the design, specification, permitting and planning for the initial boreholes for characterising an LSSR host rock in a sedimentary sequence. To achieve the desired outcomes set out in the introduction, we have identified the following areas of scope for this work: 1. Design a series of workshops and supporting work between workshops that will deliver the necessary understanding across the relevant teams in RWM. (Approx Dec/Jan 2019/2020) 2. Deliver the workshops and supporting work in an efficient manner producing reports capturing the methodology, outputs and conclusions of each workshop. (Approx Dec 2019 – Oct 2020) 3. Produce structured reports capturing the activities, processes and interactions between different functions in RWM and the supply chain necessary to deliver site characterisation. (Approx Oct 2020 – Mar 2021) 4. Produce a report capturing the lessons learnt from the workshop approach to the testing to inform the planning of Work Package 3. (Approx Jan-Mar 2021). 5. Specific development of the work process maps for geosphere and gas research activities during the early part of site characterisation. 6. Specific development of the work process maps for hydrogeology/hydrogeochemistry related activities during the early part of site characterisation.