Date of dispatch of this notice: 23/07/2021
Expire date: 27/08/2021
External Reference: edd787a3-f896-4197-9fe3-518ac1a4f2da
Date of dispatch of this notice: 23/07/2021
Expire date: 27/08/2021
External Reference: edd787a3-f896-4197-9fe3-518ac1a4f2da
Official name: Magnox Ltd
Url: https://www.gov.uk/government/case-studies/shared-services-alliance-ssa-for-nuclear-decommissioning-estate
Address line 1: Oldbury Technical Centre
Town: Thornbury
Postal Code: BS35 1RQ
Country: England
Contact person: Sarah Deeble
E-mail: Sarah.j.deeble@magnoxsites.com
Phone: +44 7710063035
Title attributed to the contract: Berkeley Blower House Remediation
Description:
The project objective for the Works is to retrieve all stored ductwork and associated steelwork for waste consignment by the Employer, removals, cleaning and disposal of asbestos within the Blower Houses, undertaking of C&M Preparation or enabling works, demolition of 4no Blower Houses and the disposal of the inert building fabric materials. It is currently anticipated that the contract term will be 6 years, although the exact duration will be subject to the tenderers proposed programmes for the works and negotiation. The definition of completion for the Works is foreseen to be achieved when the following has been completed • All primary circuit ductwork and associated support steelwork retrieved and transfer of ownership to the waste processing contractor for waste radiological characterisation, • All conventional inert and hazardous materials removed from site, • The Blower Houses demolished to surrounding ground surface level, • Radiological contamination cleaned with debris and waste transferred to the Employers Waste Team, • Completion of all Care & Maintenance Preparation works in readiness for quiescent period including: New protective weatherproof envelopes, Lower secondary shield openings sealed, Sealing of gas circulation duct penetrations, Construction of flood protection, Secure permanent barriers to deter unauthorised access, Installation of new lighting, • Long term water management strategy accepted and implemented for rainfall within residual Blower House open voids, and • Adjoining Safestore buildings and resulting Blower Houses basements and voids left in a safe state for transfer to C&M quiescent period. This procurement will utilise the Competitive Procedure with Negotiation All details of the procurement process are contained within CTM.
Additional data can be found using the link above link which outlines the Selection Questionnaire and Expression of Interest Process and documents to be completed.