II.1)
Scope of the procurement
Request for Information regarding leaching experiments using AGR graphite samples
Reference number:
RWM585/PIN
73110000
-
Research services
Services
II.1.4)
Short description
RWM has commissioned work to measure and further understand the release of carbon-14 from irradiated AGR graphite under a range of conditions. This work has an experimental programme that closely follows the methods and test durations previously studied for Magnox graphite to provide comparable results. Due to nature of the work, only a small number of graphite samples from two AGR stations are being investigated in initial leaching experiments. However, to understand the variabilities in the carbon-14 release behaviour from graphite across the AGR fleet, RWM has expressed a vision to make comparative measurements on samples from all AGR reactors. Although an extensive programme of long-term leaching may not be feasible, shorter-term experiments, lasting 3-6 months, may be suitable for this purpose along with a wider characterisation programme to understand the inventory within AGR graphite. RWM wishes to find out if there are suppliers who can meet the requirements of this work.
II.1.5)
Estimated total value
Value excluding VAT: 300000.00
GBP
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
73110000
-
Research services
II.2.3)
Place of performance
NUTS code:
UK -
UNITED KINGDOM
II.2.4)
Description of the procurement
RWM has commissioned work to measure and further understand the release of carbon-14 from irradiated AGR graphite under a range of relevant conditions. This will involve measurement of total carbon-14 release into the gas and aqueous phases, together with characterisation of the carbon speciation. This work has an experimental programme that closely follows the methods and test durations previously studied for Magnox graphite to provide comparable results. Due to nature of the work, only a small number of graphite samples from two AGR stations are being investigated in initial leaching experiments. However, to understand the variabilities in the carbon-14 release behaviour from graphite across the AGR fleet, RWM has expressed a vision to make comparative measurements on samples from all AGR reactors. Although an extensive programme of long-term leaching may not be feasible, shorter-term experiments, lasting 3-6 months, may be suitable for this purpose along with a wider characterisation programme to understand the inventory within AGR graphite. RWM wishes to find out from the market if there are suppliers who can meet the specific requirements of this work.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 300000.00
GBP
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
24
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no