Prior information notice

Information

Published

Expire date: 05/01/2022

External Reference: 2021-466758

Prior information notice

Prior information notice

Works

This notice is for prior information only

Section I: Contracting authority

I.1)

Name and addresses

Morgan Sindall Construction and Infrastucture
04273754
Allday House / Warrington Road, Birchwood
Warrington
WA3 6AU
UK
Contact person: Dawn Keenan
NUTS code:  UKD11 -  West Cumbria
Internet address(es):
I.2)

Joint procurement

The contract is awarded by a central purchasing body
I.3)

Communication

The procurement documents are available for unrestricted and full direct access, free of charge, at:  
https://sharedsystems.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=15333&B=SELLAFIELD
Additional information can be obtained from
the abovementioned address:  
I.4)

Type of the contracting authority

Body governed by public law
I.5)

Main activity

Other activity:  Nuclear Decommissioning

Section II: Object

II.1)

Scope of the procurement

II.1.1)

Title

STEELWORK AND EXTERNAL ENVELOPE
Reference number:  PPP/MPPKDP2/6
II.1.2)

Main CPV code

45000000  -  Construction work
II.1.3)

Type of contract

Works
II.1.4)

Short description

This package of work consists of Steelwork – known as KDP2 and External Envelope – known as KDP6. The scope includes all the typical elements of work usually associated with the delivery of steelwork, both structural and other, and the cladding of industrial buildings. It is intended that the scope includes the following general classifications of work. Please note that this list is non-exhaustive. Early Contractor Involvement, Final Design, Temporary Works, Structural Steelwork, Steel Frames, General Steelwork, Structural Metalwork, General Metalwork, Metal Decking, Metal Walkways, Edge Protection, Cladding and Roofing. All works to include supply and erect services. Early Contractor Involvement (ECI) is seen as one of the PPP’s key drivers to procure in this way, as it will enable the supply chain to have a long-term influence on the way in which projects are designed and delivered. This is a 18 year framework.
II.1.5)

Estimated total value

Value excluding VAT: 249000000.00  GBP
II.1.6)

Information about lots

This contract is divided into lots: no
II.2)

Description

II.2.2)

Additional CPV code(s)

45213250  -  Construction work for industrial buildings
45213251  -  Industrial units construction work
45223210  -  Structural steelworks
45223220  -  Structural shell work
45261213  -  Metal roof-covering work
45262400  -  Structural steel erection work
45262420  -  Structural steel erection work for structures
II.2.3)

Place of performance

NUTS code:  UKD11 -  West Cumbria
Main site or place of performance:  
UKD11 Sellafield Site
II.2.4)

Description of the procurement

The Programme and Project Partners (PPP) at Sellafield are undertaking a procurement exercise to engage with Key Delivery Partner’s (KDP’s) via a Multi Project Procurement (MPP) process. The PPP model has been established to deliver approximately 25 projects consisting of new build, as well as some upgrade and refurbishment of existing buildings This package of work consists of Steelwork – known as KDP2 and External Envelope – known as KDP6. The scope includes all the typical elements of work usually associated with the delivery of steelwork, both structural and other, and the cladding of industrial buildings. It is intended that the scope includes the following general classifications of work. Please note that this list is non-exhaustive. Early Contractor Involvement, Final Design, Temporary Works, Structural Steelwork, Steel Frames, General Steelwork, Structural Metalwork, General Metalwork, Metal Decking, Metal Walkways, Edge Protection, Cladding and Roofing. All works to include supply and erect services. Early Contractor Involvement (ECI) is seen as one of the PPP’s key drivers to procure in this way, as it will enable the supply chain to have a long-term influence on the way in which projects are designed and delivered. The outcomes being projects that are delivered more safely, are better designed (innovative), of a higher quality, whilst being environmentally sympathetic, easier to maintain, delivered on time and within budget. The 18-year framework provides an unparalleled opportunity for the PPP and supply chain to develop long-term relationships that can grow and adapt organically over time, to create a world class legacy of excellence for the design and construction of nuclear facilities.
II.3)

Estimated date of publication of contract notice:

09/12/2021

Section IV: Procedure

IV.1)

Description

IV.1.8)

Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement : no
IV.2)

Administrative information

Section VI: Complementary information