SJD/241120 - Supply and Regeneration of MFU's Granulated Activated Carbon

The supply and regeneration of granulated activated carbon (GAC) contained within 9 mobile filter units at the Magnox Harwell Groundwater Plant, to manage chemical contamination of groundwater. There are 9 MFU's at the plant, with each holding 15m3 of GAC. This supplies and servicing requirement is to provide a regular exchange programme of the filter units and to supply regenerated carbon to each filter unit at the time of exchange. The service requirement includes collection of 2 MFU's at each scheduled exchange, transportation to the regeneration facility and return of 2 MFU's to the ground water plant facility within 1-2 working days from the collection date. The collection date to be within 3 working days of Magnox notification that an exchange is required. The supplier is required to ensure that after regeneration, the GAC filter medium is capable of a maximum design flow rate of 2,000 m3/d through the groundwater plant.

Supplies

19/01/2021 12:00:00

24954200-8  Regenerated activated carbon

Magnox
CTM Portal for the NDA Shared Services Alliance
Calder Bridge
CA20 1PG
Seascale
United Kingdom

Sally-Jane Dive
https://www.gov.uk/government/case-studies/shared-services-alliance-ssa-for-nuclear-decommissioning-estate

Published notices
Live Opportunity (Contracts Finder) 12/12/2020 12:01
Contract notice (TED (v209)) 10/12/2020 11:40
Awarded Contract (Contracts Finder) 01/06/2021 14:31
Contract award notice (TED (v209)) 01/06/2021 14:40
Packages
Supply and Regeneration of Granulated Activated Carbon and Transportation of Mobile Filter Units to Harwell Groundwater Plant

The supply & regeneration service of Granular Activated Carbon (GAC) & transportation of mobile filter units (MFU's) to/from the Groundwater Plant at Harwell Site & the Supplier's treatment site. The Supplier must have experience and hold the appropriate Environmental Permits & Licenses. The Supplier must be able to support a turn-around service of 2 MFU's within 3 days of collection and treat 15m3 of GAC within each unit. The GAC filter medium must allow 2000m3/d through the groundwater plant.

Instructions to bidder:

Attached as document

Additional information:
Documents Documents
Close